mirror of
https://github.com/turnstonelabs/turnstone.git
synced 2026-08-12 23:12:23 -06:00
059bbc3729
The Stage 2 verb-shape lift converged coord and interactive on the
unified /v1/api/workstreams/{ws_id}/<verb> URL tree; the
/v1/api/coordinator/* tree was removed in P0. Two docs still
documented the pre-lift surface:
- coordinator-api-tour.md (the integrator's lifecycle walk-through):
rewrites all 9 step URLs to the post-lift paths, keeps a one-block
callout noting the historical /v1/api/coordinator/* tree and why
it converged, and drops the operation-id column (operation ids
shifted with the URL move and are now best looked up live via
/openapi.json + Swagger UI rather than baked into prose).
- bulk-endpoints.md (the cascade-mutation shape contract): two table
rows for stop_cascade / close_all_children fixed.
No code changes. CHANGELOG entry kept implicit since this is doc-only
and the URL convergence itself was already documented under the P0
verb-lift CHANGELOG block.